FORMWORK DEMANDS ON CRANE OPERATION
Martin Štěrba, David Čech, Václav Venkrbec, Vít Motyčka
Strony: 78-84
Opublikowano: 1 Jan 2013
Wyświetlenia: 239
Pobrania: 27
Streszczenie: Before the construction outset it is not possible to precisely define the demands on the crane operation. Nevertheless, it is necessary to define the real demands as precisely as possible. The only way to reach this is to determine the process that will require the biggest demands during the construction. System formworks in monolithic assembled constructions appear to be very demanding. The article shows the requirements during the mounting of system formwork by cranes. It further indicates considerable differences among time norms in planning programs. Time norms in the planning programs are compared with the time reality in certain constructions at the end of the article.
Słowa kluczowe: operation, element, system, construction, transfer
Cytowanie artykułu: Martin Štěrba, David Čech, Václav Venkrbec, Vít Motyčka. FORMWORK DEMANDS ON CRANE OPERATION. Journal of International Scientific Publications: Materials, Methods & Technologies 7, 78-84 (2013). https://www.scientific-publications.net/en/article/1003090/
Powrót do spisu treści tomu
© 2026 The Author(s). This is an open access article distributed under the terms of the
Creative Commons Attribution License https://creativecommons.org/licenses/by/4.0/, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. This permission does not cover any third party copyrighted material which may appear in the work requested.
Disclaimer: The Publisher and/or the editor(s) are not responsible for the statements, opinions, and data contained in any published works. These are solely the views of the individual author(s) and contributor(s). The Publisher and/or the editor(s) disclaim any liability for injury to individuals or property arising from the ideas, methods, instructions, or products mentioned in the content.