FORMWORK DEMANDS ON CRANE OPERATION
Martin Štěrba, David Čech, Václav Venkrbec, Vít Motyčka
Pages: 78-84
Published: 1 Jan 2013
Views: 254
Downloads: 33
Abstract: Before the construction outset it is not possible to precisely define the demands on the crane operation. Nevertheless, it is necessary to define the real demands as precisely as possible. The only way to reach this is to determine the process that will require the biggest demands during the construction. System formworks in monolithic assembled constructions appear to be very demanding. The article shows the requirements during the mounting of system formwork by cranes. It further indicates considerable differences among time norms in planning programs. Time norms in the planning programs are compared with the time reality in certain constructions at the end of the article.
Keywords: operation, element, system, construction, transfer
Cite this article: Martin Štěrba, David Čech, Václav Venkrbec, Vít Motyčka. FORMWORK DEMANDS ON CRANE OPERATION. Journal of International Scientific Publications: Materials, Methods & Technologies 7, 78-84 (2013). https://www.scientific-publications.net/en/article/1003090/
Back to the contents of the volume

Submit Feedback

We value your input! Use this form to report any concerns or provide feedback on our published articles. All submissions will be kept confidential.

By using this site you agree to our Privacy Policy and Terms of Use. We use cookies, including for analytics, personalisation, and ads.